|
|
|
 |
|
 |
|
 |
 |
C2009-735
Worker checks the Increased Fidelity Actuator Hardware Installation in PSF.
+ View Enlargement |
 |
|
 |
 |
C2008-2914
GRC team poses around the Fluids Integrated Rack (FIR) for Space Station.
+ View Enlargement |
 |
|
 |
 |
C2008-2865
Technicians make final adjustments to the Fluids Integrated Rack (FIR) for Space Station.
+ View Enlargement |
 |
|
 |
 |
C2008-839
Constellation Program Office tour of the Ares I-X fabrication facility.
+ View Enlargement |
 |
|
 |
 |
C2008-558
Technicians attach overhead crane to upper stage simulator segment for stacking operation in the high bay of PSF.
+ View Enlargement |
 |
|
 |
 |
C2008-574
Ares I-X US-4 Segment being stacked onto the uppper stage simulator assembly in the High Bay of PSF.
+ View Enlargement |
 |
|
 |
 |
C2007-2356
Ares I Upper Stage Steering Mechanism test on the Thrust Vector Control Test Rig in PSF.
+ View Enlargement |
 |
|
 |
 |
C2007-1681
Ares I-X Pathfinder (PF-1) Segment delivered to the High Bay in PSF.
+ View Enlargement |
 |
|
 |
 |
C2007-1708
Delivery of Ares I-X Pathfinder (PF-2) Segment from the Fabrication Shop to PSF.
+ View Enlargement |
 |
|
 |
 |
C2001-242
Shuttle crew training for Combustion Module 2 (CM-2) in the High Bay of PSF.
+ View Enlargement |
 |
|
 |
 |
C2002-1836
Overview of the Class 100 clean room in the PSF.
+ View Enlargement |
 |
|
 |
 |
C98-2212
Operations in the Telescience Support Center during a shuttle mission.
+ View Enlargement |
 |
|
 |
 |
C89-5565
Solar concentrator setup in the High Bay area of PSF.
+ View Enlargement |
 |
|
|
|